Dynamic Scheduling with Incomplete Information
Hannah Bast
Max Planck Institute, Saarbrücken
We consider the following scheduling problem: Our goal is to execute a given
amount of arbitrarily decomposable work on a distributed machine as quickly as
possible. The work is maintained by a central scheduler that can assign chunks
of work of an arbitrary size to idle processors. The difficulty is that the
processing time required for a chunk is not exactly predictable---usually the
less, the larger the chunk---and that processors suffer a delay for each
assignment. Our objective is to minimize the total wasted time of the
schedule, that is, the sum of all delays plus the idle times of processors
waiting for the last processor to finish. We introduce a new deterministic
model for this setting, based on estimated ranges [a(w),b(w)] for processing
times of chunks of size w. Depending on a, b and a measure for the overall
deviation from these estimates, we can prove matching upper and lower bounds
on the wasted time, the former being achieved by our new balancing
strategy. This is in sharp contrast with previous work that, even under the
strong assumption of independent, approximately normally distributed chunk
processing times, proposed only heuristic scheduling schemes supported merely
by empirical evidence. Our model naturally subsumes this stochastic setting,
and our generic analysis is valid for most of the existing schemes too,
proving them to be non-optimal.